REEA Foundation Hostel Requirements - 2014

  • Installation of an internal intercom system
  • Improved living facilities for the men, increase the size of the building allowing for personal space and incorporating the men living on the nursery property into the main building
  • Men’s shower facility needs upgrading and the installation of an extractor
  • Ablution blocks need new flooring
  • Emergency lighting throughout the building
  • Correct locking mechanisms on emergency exits throughout
  • Male sick bay facility
  • TV room needs redecorating
  • Dining room floor needs attention and possibly replacing
  • Nursing station needs repainting and improvements needed
  • Kitchen floor needs replacing
  • Kitchen needs to be re-designed to maximise space available
  • Kitchen equipment will need replacing in the near future
  • Ramp on the female side needs new skirting boards
  • Carpeting in the female wing needs replacing
  • Ablution flooring needs replacing
  • Entire facility needs repainting inside and outside
  • Gutters need replacing
  • Facia boards need replacing
  • Creation of a facility for married couples (portable homes etc)